Sannox Hotel
Due Diligence Latest: 23rd May 2024
Building Warrant Audit Trail
Here are the approved Building Warrant bona fides and documents relating to the Sannox Hotel renovation. Specifically the final 10% (approx) of work, including “snagging” to progress the Building Warrant element to the crucial COMPLETION CERTIFICATE for this major renovation project and reach the much anticipated RE-OPENING PHASE for Sannox Hotel and the new Sannox Village Shop etc…
^^ Sannox Hotel, Island of Arran ^^
^^ With Newbuild Bay Cottage ^^
(Right Hand Side)
For a clearer indication of…
Bay Cottage
Here is the outline in red ink…
Now 90% Completed
^^ ^^ Bay Cottage ^^
As At January 2024: 90% Completed
^^ Bay Cottage ^^
^^ After Engineering Tests On Existing Slabwork ^^
Here is what the 40 year old, dilapidated conservatory looked like…
^^ The Old Conservatory ^^
During the demolition phase…
Newbuild Extension At The Front Visible (July 2023)…
.
This replaced the dilapidated ugly old conservatory.
***********
BUILDING WARRANT APPROVED
Here is the penultimate Building Warrant.
^^ Building Warrant For ^^
Sannox Hotel + Newbuild Cottage + Village Shop
Plus for good measure, here too is a copy of the original Planning Permission…
^^ Building Warrant For ^^
Sannox Hotel + Newbuild Cottage + Village Shop
Equals the final 10% of snagging works
to reach the Completion Certificate.
Here are the architect’s plan drawings for reference. Please note there is substantial additional work due to the SUPERMARKET element with negotiations from the mainland competition to the three (exclusively Co-op) supermarkets operating on Arran.
Sannox Hotel: Location Drawings
***********
Sannox Hotel: Ground Floor
Existing Layout
***********
Sannox Hotel: First Floor
Existing Layout
***********
Sannox Hotel: South & East Elevations
Existing Elevations
***********
Sannox Hotel: North & West Elevations
Existing Elevations
***********
Sannox Hotel: Ground Floor
Plan Drawing: As Proposed
Now 90% Completed
Red Ink Snagging: Final 10% of Renovation.
Add Double kin Fire Retardant Fire Boards.
***********
Sannox Hotel: First Floor ~ Proposed
Now 90% Completed
Red Ink Snagging: Final 10% of Renovation.
Add Double Skin Fire Retardant Fire Boards.
***********
Sannox Hotel: Architect
Key To Plan Symbols
***********
Sannox Hotel: South & East Elevations
Proposed Elevations
***********
Sannox Hotel: North & West Elevations
Proposed Elevations
***********
Sannox Hotel: Dilapidated Conservatory
Now NEWBUILD Owner’s Accommodation
Proposed Elevation
***********
Sannox Hotel:
Dilapidated Conservatory Demolition.
Newbuild Owner’s Accommodation
Architect Specifications
***********
Sannox Hotel:
Roof Loading Calculations & Engineer BSA.
Newbuild Owner’s Accommodation
Proposed Layout
***********
Sannox Hotel:
Disability Accessible WC Facilities
***********
***********
Building Warrant
Approval
& Contemporaneous Notes
***********
PLANNING PERMISSION APPROVED
Permission to fully renovate + roofwork + rewire + replimb + new central heating + high-spec insulation + ne fire alarm system. Add 3 new guest bedrooms. Add new owner’s accommodation. Add new village shop. Voluntarily add 4 new parking spaces (to make the shop more user-friendly.
^^ Official Source: Click Here ^^
Conditions Satisfied. Work began within 3 weeks (as opposed to the 3 year Planning Permission condition). The council officials observed and noted this 3 week commencement event. An important element as this makes the Planning Permission “enduring” (lifelong – as long as it takes – no limits). The permission states “work must be commenced within 3 years of permission being granted”. We have already satisfied that condition . There is no end date requirement. Just as well, because Covid caused problems and delays to the entire industry. We were relatively unscathed as there is NO mortgage on the hotel. Though elsewhere in the UK as hotels were limited in trading during the pandemic and several did not survive. Those hotels that were heavily mortgaged ended up being flogged off in a disgraceful banking conduct similar to the notorious RBS scandal (here).
***********
^^ Sannox Hotel, Island of Arran ^^
Any questions, please call or text…
Scotslion Ltd., on: 0757 2768 795.